Fleet Grounding Highlights

  • Monitoring 895 commercial passenger aircraft globally affected by mandatory airworthiness directives and engine shop visit queues.
  • Primary disruption driver is the Pratt & Whitney PW1100G GTF powder metallurgy inspection campaign affecting over 600 A320neo family jets.
  • Average wing-off downtime ranges from 90 to 280 days due to global MRO titanium disk and turbine blade supply chain bottlenecks.
  • Airlines lease supplementary classic aircraft (A320ceo, 737-800) to maintain scheduled network capacity while engines undergo shop visits.
Total Grounded Airframes (Est.) 895 Aircraft
PW1100G GTF Campaign 640 Airframes
CFM LEAP Durability Kit 180 Airframes
Trent 1000 Blade AD 75 Airframes

Active Regulatory Directives & Engine Campaigns

Detailed inspection mandates, impacted operator fleets, and estimated shop visit turn-around times.

FAA AD 2024-0012 / EASA Emergency AD Ongoing Phased Shop Visits (2024-2026)

Pratt & Whitney PW1100G GTF Powder Metallurgy Blade Inspections

Microscopic contaminants in rare powder metallurgy high-pressure turbine disks requiring ultrasonic scan.

Affected Sub-Fleet Airbus A320neo & A321neo Sub-Fleets
Powerplant Family Pratt & Whitney PW1100G-JM
Grounded Airframes 640 Jets
Avg Wing Downtime 280 Days
Key Impacted Operators:
IndiGoWizz AirSpirit AirlinesLufthansaVolarisAir New Zealand
CFM Service Bulletin SB 72-1082 / FAA Notice HPT Redesign Durability Kit Deployment

CFM LEAP-1A & LEAP-1B High Pressure Turbine Stage 1 Durability Upgrades

Accelerated environmental thermal coating distress in dusty, high-temperature operating environments.

Affected Sub-Fleet Boeing 737 MAX & Airbus A320neo Hot/Harsh Operators
Powerplant Family CFM LEAP-1A / LEAP-1B
Grounded Airframes 180 Jets
Avg Wing Downtime 120 Days
Key Impacted Operators:
flydubaiAir India ExpressLion AirSpiceJetAeromexico
EASA AD 2023-0194 TEN Redesign Retrofit Active

Rolls-Royce Trent 1000 IPC/HPC Blade Durability Inspections

Intermediate and high-pressure compressor blade vibration fatigue and thermal degradation.

Affected Sub-Fleet Boeing 787-8 & 787-9 Dreamliners
Powerplant Family Rolls-Royce Trent 1000 Package B/C/TEN
Grounded Airframes 75 Jets
Avg Wing Downtime 90 Days
Key Impacted Operators:
British AirwaysVirgin AtlanticAir New ZealandLATAMScoot